New Energy Projects and Technological Innovations
Issued Time :2015-02-05 09:20:31

Solar Power Generation Projects:

1)1MW Building Photovoltaic Synchronization Demonstration Project in Xi'an Export Processing Zone

This project is located in Export Processing Zone phase one factory of Xi'an Economic Development Zone. The photovoltaic modules are produced by BP (Jiayang) SunOasis Co. Ltd. The suppliers for inverters include: TBEA SunOasis Co., Ltd (one set of 500KW and three sets of 100KW inverters), Emerson Network Power (one set of 250KV inverter) and Shaanxi Changling Photovoltaic Industry Co., Ltd (two sets of 5KV inverters).

After the operation of the demonstration project, the expected power generating capacity is 1.3 million KW/H and 170t carbon dioxide emissions can be reduced annually, which improves the environmental efficiency obviously. According to the product quality assurance, the power plant will continuously supply 32.5 million KW/H clean and substantial power to power grid in the next 25 years. In this way, the three technology environmental protection theories (circular economy, new energy and ecological green processing zone) are combined and integrated perfectly.

O&M Power has participated in the equipment commissioning and development of the operating & monitoring software for this project and provided an effective guarantee to the intelligent monitoring. With the participation of O&M Power, the power plant operation and management efficiencies are improved, the personnel management cost is saved as the photovoltaic power station remote integration of management and control is achieved.

2)Qingtongxia Photovoltaic Synchronization Power Plant Phase-1 10MW Project owned by Datang Corporation

The total capacity for the Qingtongxia Photovoltaic Synchronization Power Station Project of Datang Corporation is planned to be 100MW. The installed capacity for the phase-1 project is 10 MW. It will be located in Shengjia Dunliang, north of the New Material Base Xinjing Road in Qingtongxia City of Ningxia Hui Autonomous Region. The project will cover about 350,000 m2, with 50000 pieces of solar photovoltaic modules and 10 rectangular photovoltaic arrays in arrangement.

After completion of the phase-1 project, 14.904 million KW/H clean power will be supplied to the power grid every year. Compared with the coal fired power plant with same power production, the project can save the standard coal 5216.5 t. for the country every year.

O&M Power has participated in the equipment installation, commissioning and development of the operating & monitoring software for this project and provided an effective guarantee to the intelligent monitoring. With the participation of O&M Power, the power plant operation and management efficiencies are improved, the personnel management cost is saved as photovoltaic power station remote integration of management and control is achieved.

3)1MW Building Integrated Photovoltaic Demonstration Project

Gongyuan Solar Co., Ltd. declared the roof 1.55 MW Building Integrated Photovoltaic Demonstration Project in 2009, the total installed capacity is about 1 MW. It consists of 50KW synchronization photovoltaic power generation system in Huangyan secondary school dormitory, 650 KW synchronization photovoltaic power generation system in Shuangpu base and 300kW synchronization photovoltaic power generation system in Gongyuan Solar Co., Ltd.

O&M Power has participated in engineering and construction parts of Shuangpu base 650KW synchronization power generation system. The system consists of Shuangpu base workshop-2 roof subsystem, workshop-4 roof subsystem and office roof subsystem, the installation form is building materials type building integrated photovoltaic (BIPV).

O&M Power, taking full advantages of own strengths, provides on-line monitoring system software for the project to realize photovoltaic power station remote integration of management and control.