Gas Turbine Power Generation Operation Contract Project |
|
Introduction of Bangladesh Chandpur GE 9E 1X150MW Combined Cycle Power Plant Project |
|
|
Chandpur gas-fired power station, located in Chandpur, Bangladesh, has established one set of 120MW gas turbine generator unit (supplied by GE) and one set of HRSG (heat recovery steam generator) generator unit. This project is designed as a 150MW gas and steam combined cycle power station (PG9171E Gas Turbine + HRSG + Steam Turbine)
|
NW power is responsible for undertaking training, unit commissioning, performance test, and operation and providing operation and maintenance technical service during quality guarantee. This project has been handed over in August 2012 successfully. |
Nigeria 8X42MW Gas Turbine Unit Commissioning Project |
|
|
Nigeria Pallando phase-1 (8x42MW) gas turbine project adopts equipment from GE. The project lasted for 27 months and NWPower had undertaken the gas turbine commissioning work of the project. |
On May 27, 2007, Nigeria Pallando Gas-fired Power Plant phase-1 project held a grand ignition launching ceremony. President Obasanjo of Nigeria attended the ceremony and made a speech. In the speech, President Obasanjo expressed that he is very pleased to attend the ceremony. Pallando Power Plant is another successful example of the cooperation between Nigeria and China in infrastructure construction. He praised the efforts by Chinese companies in the construction of Pallando Power Plant. The successful construction of the project is of great significance to relieve the power shortage in Nigeria and has promoted the local economic prosperity. |
|
|
|
|