Items of normal test:
Interlock tests of all auxiliaries
Static test before whole set startup
Leakage test of condenser vacuum system by water filling
Calibration test of governor valve _ power plant operation and maintenance services
On-site and remote latch-off test
ETS logic test
Turbine, boiler and electrical interlock test
Initial rolling test of steam turbine
Friction and inspection test _ commissioning technical services of power plant
Steam valve leakage test
OPC test of steam turbine
DEH overspeed test of steam turbine
TSI overspeed test of steam turbine
Mechanical overspeed test of steam turbine
Vacuum leakage test
Logic and commissioning test of unit bypass
Commissioning test of deaerator
Commissioning test of HP&LP heaters
Valve test of governor valve _ commissioning technical services of power plant
Items of special tests:
Single side operation test of condenser
Single circulating water pump operation test
RB & FCB test
All individual commissioning
All system-by-system commissioning
Whole set startup commissioning
Service Contents of diagnose and solution to power plant problems
Speed governing system shaking
Unit body vibration _ power plant operation and maintenance services
Oil filtration system
Lube oil pressure setting
Jack oil pressure setting
Inspection and solution to low vacuum
Inspection and solution to excessive air temperature
Vibration inspection and solution of all auxiliary equipment
Inspection and solution to insufficient output of auxiliary equipment
Regulation of air fan blades
Transformation
Unit system transformation
|