large-scale thermal power project
Introduction of Operation for Large-scaled CFB Unit Contract Projects
Introduction of Chemical System of Nuclear Power Plant
Gas Turbine Power Generation Operation Contract Project
Introduction of Seawater Desalination Project
Introduction of Power Transmission and Distribution Project
New Energy Projects and Technological Innovation
    large-scale thermal power project
 
 Indonesia INDRAMAYU 3X330MW Power Plant
 

INDRAMAYU 3 X 330MW coal-fired power plant is one of the largest power plants using the most Chinese equipment and with the highest capacity in Indonesia at present. It is the backbone power plant of Indonesia national power generation group. NWPower has participated in the commissioning and trial operating contract of this project.

This project uses centralized control of turbine, boiler and generator and applies American Foxboro system. This unit adopts DCS (distributed control system), through which startup, shutdown operation monitoring control, troubleshooting, management and other functions for turbine, boiler, generator and its auxiliary systems can be realized in CCR (central control room) under a rear cooperation of the local operators and operations. This project uses coal resources from SUMATERA and KALIMANTAN, delivered by barge and supplied through coal jetty constructed in the power plant. The cooling system uses seawater from Java Island and it applies once through cooling mode. There is seawater desalination station installed inside the power plant. The water after being desalinated is used as service water and boiler makeup water.
Unit operation mode: the unit of this project is mainly on base load and it is also capable of adjusting peak load. The unit can be started up and the load can be increased under cold state, warm state, hot state and super hot state. The unit also has RB function, to be adaptable to load limit working condition, and to constant pressure and sliding pressure working condition as well.
This power plant construction was started in Sep 1997. On Oct 19th, 2010, #1unit had passed 168-hour reliable trial running test. NWPower had accomplished items such as trial running, operation during warranty period, performance test, and overhaul during warranty period. NWPower also accomplished manual compilation, trainee's position training and other technical services
On August 18th, 2011, NWPower has officially handed over these three units to Indonesia national power generation group. By successfully achieving 168-hour reliable trial running test and performance test of two units within one month, NWPower was awarded as Meritorious Construction Partner by the Minister of Indonesia Economic Division and PLN president on the significant hand-over ceremony.

 
 Indonesia Rembang 2X315MW Unit Power Plant Project
 

The EPC contractor of Rembang power plant project is a Consortium (ZELAN-PRIAMANAYA-TRONOH CONSORTIUM) signed with Indonesian National Power Corporation (PT PLN) on 21st, March, 2007. DEC (Dongfang Electric Corporation) provides equipment and technical services. NWPower, as a subcontractor, serves as the technical consultant in commissioning and operation supervision.

DEC (Dongfang Electric Corporation) provides BTG island design and equipment for Rembang project, including system designs like BTG island, ash slag handling system, flue gas duct, startup boiler room, hydrogen generation station, circulating water pump house. Besides, it also includes the design, manufacturing, testing, packing and transportation of the relative equipment and materials as well as guidance and trainings for equipment and system commissioning, operation and maintenance.
From the beginning of 2009 till the last NWPower staff's leaving from the site in October 2013, NWPower had successfully accomplished training, manual compilation, operation, maintenance and other guidance services during warranty period.

 
 Mariveles 2X300MW Coal-fired Power Plant, in Philippines
 

Mariveles Power Plant is located at Mariveles, Luzon Island, Philippines, with West facing China South Sea and Manila Bay on the east. Project site is more than 200 km away from the Capital Manila City. The project is currently the only one permitted on Luzon Island. The construction period of Unit 1 lasted for 35 months. Total duration for commercial operation requires 38 months. Upon completion of this project, power shortage will be eased and development of local business will be accelerated.
NWPower undertakes training, manual compilation, operation, maintenance and other services of this project.

 
 Operation & Maintenance Project for Xinjiang Karamay 2X350MW Coal-fired Power Plant (Owned by China Guodian Corporation)
 

China Guodian Group has invested about 2,986,000,000 RMB to Karamay 2X350MW heat and power generation project, which is located in Karamay petrochemical industrial park. In September 2013, NWPower undertook this project to provide operation and maintenance services to main equipment and auxiliaries, as well as coal handling system for these two 350MW units.

Two 350MW heat and power generation units for this project are supercritical, air-cooling and condensing steam-extraction ones, as well as employing new technologies such as flue gas desulfurization, flue gas denitration, plasma oil-free ignition, high-efficiency ESP and others.
The city is 330 kilometers away from the capital city Urumchi and is an important new industrial city of municipality and a key petroleum and petrochemical base in western China. Guodian Karamay 2X350MW combined heat and power generation project is the key construction project in Xinjiang Uygur Autonomous Region "Twelfth Five Year Plan" and one of the important thermal power projects that planned by Guodian Group to put into operation by the year, it is also an important heat and power source construction in Karamay general heat supply plan and combined heat and power generation plan. The construction planned achieving operation of N0.1 unit and city central heating in the year, which will play an important role in promoting the city environment protection construction.

 
 Operation & Maintenance Project QingHai Golmud Salt Lake Industrial Park Thermal Center (Owned by QingHai Salt Lake Group)
 

WPower, by official bidding, has signed the contract with QingHai Salt Lake Group about its industrial park thermal center operation & maintenance project. With enthusiastic working attitude, rich and excellent working experience, NWPower highly speed up the project implementation progress and win the recognition of owner. The cooperation between NWPower and QingHai Salt Lake Group this time has been a good start towards "Advantageous Complementarities and Win-Win Corporation" and laid a good foundation for NWPower to open up the domestic electricity market led by The Great Northwest.